Project Overview
This project is a new workshop process cooling and purification air conditioning refrigeration station project for a pharmaceutical factory in Gansu, located in Wuwei Industrial Park, Liangzhou District,Wuwei City, Gansu Province. This project is a large infusion workshop, injection molding machine, mold and blow molding machine cooling, and large infusion workshop , Purification air conditioning in the tablet and granule workshop and process cooling such as workshop sterilization and pure water preparation. According to the process production requirements, this design includes the design content of workshop purification air conditioning, comfort air conditioning (cold and heating), and production line process cooling.
New workshop refrigeration station project of a pharmaceutical factory in Gansu
Project requirements
Items |
Air-conditioned area |
Air-conditioned area |
Summer cooling temperature requirements |
Heating temperature requirements in winter |
Cleanliness |
Cold load |
Heat load |
1 |
Tablet and granule workshop |
400㎡ |
24±2℃ |
18±2℃ |
Level D |
170kw |
100kw |
2 |
Large infusion workshop |
700㎡ |
24±2℃ |
18±2℃ |
Level C |
280kw |
175kw |
3 |
Canning room |
50㎡ |
24±2℃ |
18±2℃ |
Level Hundred |
50kw |
12.5kw |
4 |
Pre-treatment workshop |
550㎡ |
24±2℃ |
18±2℃ |
- |
146kw |
82.5kw |
5 |
Sterilization workshop and changing room |
1000㎡ |
24±2℃ |
18±2℃ |
- |
224kw |
150kw |
6 |
Reserved office area |
500㎡ |
24±2℃ |
18±2℃ |
- |
125kw |
75kw |
total: |
995kw |
595kw |